Pages

Tuesday, October 19, 2021

New Bridge SLJ Activity #10

 Hello,

Today i am doing a task where i have to make a pedestrian and cyclist walk way for the Auckland Harbour Bridge. It was fun to do and i learnt a lot of stuff about bridges. This is what i did:


My idea is to have a suspended long oval over the current bridge. It will be suspended by poles and stabled with cables to the existing bridge. My bridge must be able to withstand the strong winds and maybe earthquakes. So the bridge must be flexible but stable.

Do you have another idea for the bridge ?


No comments:

Post a Comment

To support my learning I ask you to comment as follows:
1. Something positive - Begin with a greeting. Talk about something you like about what I have shared.
2. Thoughtful - A comment that will mean something to me to let me know you read/watched or listened to what I had to say. - use any language.
3. Something helpful - Give me some ideas for next time or ask me a question.
Encourage me to make another post